Facility Dashboard
UD Creamery — Coffee Shop · Thursday, Jul 16, 2026 · Live data via OpLytics Sense gateway & UNOX DDC Cloud API
Assets tracked
24
imported from Revit (IFC/COBie)
Open alerts
1 crit · 3 warn
1 info notice
PM tasks
1 overdue
3 due in next 7 days
Warranty expiring
2
within 90 days
Energy today
84 kWh
−7% vs 4-week baseline
Cold storage — live OPLYTICS SENSE
| Unit | Temp | Humidity | Door | Status |
|---|---|---|---|---|
| Walk-in Cooler | 36.4 °F | 78% | Closed | OK |
| Walk-in Freezer | -3.8 °F | — | Closed | Excursion 10:42 |
| Reach-in Cooler #1 | 38.2 °F | 71% | Closed | OK |
Temp/humidity: EM300-TH · door: WS301 magnetic contact — Milesight hardware, OpLytics-branded.
Recent alerts
Connected cooking — UNOX DDC CLOUD REST API
| Oven | State | Program | Cavity | Today |
|---|---|---|---|---|
| CHEFTOP MIND.Maps #1 | Cooking | Croissant — AM batch | 347 °F | 11 cycles · 9.2 kWh |
| BAKERTOP MIND.Maps | Idle | — | 72 °F | 6 cycles · 5.1 kWh |
HACCP logs, cycle counts and consumption sync automatically from DDC cloud. Recipes can be pushed to ovens from the platform.
Upcoming maintenance
2D Floor Plan — Digital Twin
Imported from Revit (IFC + COBie) · every equipment family = a live asset record. Click any unit to open its record.
Sensor overlays:
Operational
Attention / PM due
Fault / critical
T — Temp/Humidity (EM300-TH)
D — Door contact (WS301)
L — Zone leak (EM300-SLD)
C — Smart CT (CT10x)
3D LiDAR Scans — As-Built Record
iGUIDE PLANIX scans organised by area and stage. The as-built scan is a spatial index into the asset register: jump to a pinned asset from its record, or open asset records from inside the scan.
Select a scan above
Assets at this location LIVE FROM TOUR
Move through the tour — assets pinned to the current position appear here.
Asset Register
Every record originates from the Revit model (IFC + COBie property sets) — enriched with docs, warranty, sensors and service history.
| Tag | Asset | Category | Model | Breaker | Warranty | Next PM | Status |
|---|
Maintenance & Lifecycle
Preventive schedules, reminders and the full service log — the institutional memory that survives staff turnover.
Overdue
1
hood cleaning — 12 days late
Due next 7 days
3
reminders sent to assignees
Scheduled this month
9
across 24 assets
Logged repairs YTD
31
with photos & invoices attached
| Task | Asset | Frequency | Assignee | Next due | Status |
|---|
How reminders work
Each PM task fires reminders at T−14, T−3 and on due date — by e-mail and mobile push. Overdue tasks escalate to the facility manager and appear on the SCOPOS advisory desk if flagged. Completing a task prompts a service-log entry (who / what / photos / cost) so history stays complete automatically.
Smart Monitoring
OpLytics Sense sensor network (Milesight hardware, OpLytics-branded) + UNOX DDC Cloud API. LoRaWAN → UG65 Gateway → platform.
⚙ Hardware stack: EM300-TH temp/humidity ×3 · WS301 door contact ×2 · EM300-SLD zone leak ×3 · CT10x smart current transformer ×4 · UG65 LoRaWAN gateway ×1 — all white-labeled OpLytics Sense. Connected cooking data via UNOX DDC Cloud REST API (Enterprise).
Walk-in Freezer — 24 h temperature excursion 10:42–11:09
Excursion to +12.3 °F correlated with freezer door open 12 min (WS301 DR-02). Root cause: delivery unload. HACCP log entry auto-created.
Walk-in Cooler — 24 h temperature in range
Setpoint 36 °F · range 34–40 °F · humidity 78% avg. Compressor duty cycle 43%.
Power — smart current transformers PREDICTIVE
| Circuit / asset | Now | Baseline | Δ | Status |
|---|---|---|---|---|
| LP-2 / 14 — UNOX Combi #1 | 12.4 A | 12.1 A | +2% | OK |
| LP-2 / 8 — Walk-in cooler compressor | 9.7 A | 8.2 A | +18% | Rising draw |
| LP-2 / 22 — Dishwasher booster | 18.9 A | 19.2 A | −2% | OK |
| LP-2 / 4 — Ice machine | 6.1 A | 6.0 A | +1% | OK |
Sustained current rise on a compressor typically means condenser coil fouling or refrigerant issues — flagged for service before product loss.
Leak detection & doors
| Sensor | Zone | Reading | Status |
|---|---|---|---|
| LK-01 · EM300-SLD | Dish pit | Dry | OK |
| LK-02 · EM300-SLD | Ice machine | Dry | OK |
| LK-03 · EM300-SLD | Water filtration | Dry | OK |
| DR-01 · WS301 | Cooler door | 42 opens today | OK |
| DR-02 · WS301 | Freezer door | 28 opens · max 12 min | Long-open 10:42 |
Gateway UG65: online · RSSI good · last uplink 38 s ago. All device batteries > 82%.
Alerts & Notifications
One stream across sensors, warranty clocks, PM schedules and connected equipment. Delivered in-app, e-mail and SMS by severity.
Capital & Lifecycle Plan
5–7 year replacement forecast built from real asset data — credible numbers for budgeting, boards and donor fundraising.
| Asset | Installed | Useful life | Replace (est.) | Est. cost | Condition signal |
|---|---|---|---|---|---|
| Walk-in cooler compressor | 2025 | 10 yr | 2031 → watch | $14,500 | CT: draw +18% |
| Dishwasher (Hobart AM16) | 2025 | 10 yr | 2035 | $28,000 | Normal |
| UNOX Combi #1 | 2025 | 12 yr | 2037 | $21,300 | DDC: normal wear |
| Ice machine (Hoshizaki) | 2025 | 8 yr | 2033 | $6,900 | Normal |
| Epoxy floor — kitchen | 2025 | 7 yr re-coat | 2032 | $18,000 | Photo log active |
| Hood & exhaust fan | 2025 | 15 yr | 2040 | $32,000 | Cleaning overdue |
Forecast = install date + industry useful life, adjusted by live condition signals (CT draw, duty cycle, service history). Export: board packet PDF · grant application XLSX.
Work Orders
Every request, repair and confirmed service in one register — created manually, from alerts, from inspection findings, or auto-logged when a service is confirmed.
| WO # | Asset | Description | Requested by | Created | Status |
|---|
Inspections
Internal maintenance routines — daily checklists, compliance walk-throughs and unresolved findings.
Daily checklist — Jul 16, 2026
Compliance walk-throughs
| Date | Area | Inspector | Findings | Status |
|---|---|---|---|---|
| Jul 10, 2026 | Cook line | Tracy R. | 2 | 1 unresolved |
| Jun 26, 2026 | Cold storage | J. Alvarez | 1 | Closed |
| Jun 12, 2026 | Dish pit / warewash | Tracy R. | 0 | Clean |
Unresolved findings
| Found | Asset / Area | Finding | Severity | |
|---|---|---|---|---|
| Jul 10, 2026 | Exhaust Hood + Ansul | Grease accumulation above baffle filters — NFPA 96 cleaning overdue | High | |
| Jul 10, 2026 | Prep — epoxy floor | Epoxy chipping near floor drain, trip/sanitation risk | Medium |
Vendors
All service agencies, dealers and consultants tied to this facility — every asset record links back to its vendor and service company.
| Category | Company | Contact | Phone | |
|---|---|---|---|---|
| Dealer | Singer M.Tucker | Mark Reilly | (732) 555-0141 | service@singermtucker.com |
| Service Agency | Delaware Valley Refrigeration | Tony Marchetti | (302) 555-0122 | dispatch@dvrefrig.com |
| Service Agency | HoodPro Fire & Vent | Scheduling | (302) 555-0190 | schedule@hoodpro.com |
| Service Agency | AquaServe (Everpure / Pentair) | Lisa Chen | (302) 555-0163 | orders@aquaserve.com |
| Service Agency | First State Electric | Bill Kowalski | (302) 555-0155 | bill@firststateelectric.com |
| Manufacturer Service | Hobart Service — Wilmington | Dispatch | (302) 555-0177 | wilmington.service@hobart.com |
| Manufacturer Service | UNOX North America | Support Desk | (800) 555-8669 | service.usa@unox.com |
| Manufacturer Service | Hoshizaki Mid-Atlantic | Dispatch | (410) 555-0139 | service@hoshizaki-ma.com |
| Consultant / Advisory | SCOPOS Hospitality Group | Advisory Desk | (717) 555-0100 | advisory@scoposhg.com |
Projects & Improvements
Close-out documents sorted by capital project / renovation, plus facility assessment reports. Upload from computer or phone.
Coffee Shop Renovation Completed Sep 05, 2025
Areas / zones: Cook line · Cold storage · Prep · Dish pit · Servery
PDFPlans — architectural & FSE
PDFCutbook — approved equipment
DWGAs-built drawings
PDFPunch report — closed
PDFShop drawings — millwork & SS fab
IMGPhotos (24)
XLSCOBie export — asset data
Creamery HVAC & Powder Exhaust In planning
Pre-design scope · RFS in progress
PDFScope memo
XLSEquipment load calculations
As-built LiDAR Scans IGUIDE
One scan per area and stage (existing conditions → as-built at close-out → periodic re-scan). Scans open inside the platform and drive the 3D view for asset records.
| Area / zone | Stage | Project | Captured | Status |
|---|
Facility Assessment Reports
3D10-Year Facility LiDAR Scan (2026)
PDFKitchen Condition Assessment (2025)
PDFWastewater pH / BOD Study (2026)
Reports
Executive-level outputs generated from live platform data — exportable as PDF for leadership, boards and donors.
Daily Operational Brief
Jul 16: 1 critical alert (hood cleaning overdue — WO open), freezer temp excursion resolved (door open 12 min during delivery), 3 PM tasks due within 7 days, energy −7% vs 4-week baseline, all sensors online.
Compliance Snapshot
| HACCP temperature logs | 100% complete |
| Hood & duct cleaning (NFPA 96) | Overdue 12 days |
| Ansul system inspection | Current |
| Water filtration capacity | 85% used |
Asset Risk Register
| Asset | Risk | Live signal | Mitigation |
|---|---|---|---|
| Exhaust Hood + Ansul | Fire-code non-compliance | PM overdue 12 days | WO-1042 open — HoodPro scheduled |
| Walk-in Cooler | Compressor failure / product loss | CT draw +18% vs baseline | Early coil service Jul 22 |
| Ice Machine | Water quality / scale | Filter at 85% capacity | Cartridge reorder drafted |